Spark-Fu — Your equipment and its spare parts, all with us

Installation & commissioning

A technician from our network installs, connects and starts up your equipment on site, and hands it over with a commissioning report.

  • Handover report
  • 27 governorates covered
  • Reply within 24 hours

What does the installation cover?

Every step is checked and recorded in the handover report.

  • Site survey and foundation check
  • Positioning and fixing the equipment
  • Electrical connection and cabling
  • Fuel, oil and coolant filling
  • Start-up and test run
  • Handover and operator briefing

How does it work?

  1. Send your request

    Tell us the equipment and where it is

  2. We review the details

    Your quote within 24 hours

  3. We confirm a date

    We book the visit with you

  4. The technician delivers

    You receive the written report

Your guide to the right power solution

Choosing the right power solution takes a precise understanding of your site's total continuous and peak loads. Our range covers diesel generators from small ratings for offices and restaurants up to the large capacities factories, major oil facilities and hospitals need.

We also supply load banks built for testing generators and simulating loads, so your site never loses power unexpectedly, plus mobile lighting towers that serve construction, road and night-time projects efficiently and move easily.

Frequently asked questions

Used generators are inspected for their operating condition — engine, alternator, cooling system, batteries, control panel and running hours — with a performance test to make sure no significant faults remain before they are listed.